Back
HEE

Melavc

Published
May 25, 2026

Melavc d.o.o.
Nazarje, Slovenia

Profile: Melavc d.o.o. is a family-owned company specializing in international road transport. In addition to transport services, the company provides maintenance and repair for commercial vehicles, vehicle sales, and manages warehouse and other business facilities. 

Project goal: Increasing energy efficiency, improving the utilization of self-generated electricity, and reducing peak loads through the implementation of a modular battery storage system.

Delivered solution

Storage system: GeoEnergy GE261L

Phase 1

Number of units: 4
Power per unit: 130 kW
Capacity per unit: 261 kWh
Total system power: 520 kW
Total system capacity: 1,044 kWh

Phase 2 – Expansion

Additional number of units: 3
Additional power: 390 kW
Additional capacity: 783 kWh

Final configuration

Total number of units: 7
Total system power: 910 kW
Total system capacity: 1,827 kWh

Battery technology: LFP
Battery inverters: 7 × Elecod 130 kW
Management: GridIQ
Digital monitoring: geogridIQ

Solution

The project was designed with a modular approach, allowing the system to be expanded by three additional units following the initial installation of four. The first phase provided 520 kW of power and 1,044 kWh of capacity, and with the second phase, the system was increased to 910 kW and 1,827 kWh. The storage system enables more efficient energy management within the company's facilities, peak load shaving, and better utilization of electricity generated by the on-site solar power plant.

Advanced management

The GridIQ system coordinates electricity generation, consumption, and storage, allowing the operation of the storage unit to be adjusted to the company's actual energy needs. The digital platform geogridIQ provides constant monitoring of system performance, tracking of key parameters, and an overview of energy flows.

Project result

  • initial installation 520 kW / 1,044 kWh,
  • subsequent expansion by an additional 390 kW / 783 kWh,
  • final configuration 910 kW / 1,827 kWh,
  • modular design allows the system to scale with growing needs,
  • more efficient peak load management,
  • better utilization of self-generated electricity,
  • greater flexibility and energy independence for the commercial facility.

The Melavc d.o.o. project is an example of a phased implementation of a battery storage system, where the initial solution can be expanded later without changing the basic system design.

Start filling out the form
Hvala! Vaša prijava je bila prejeta!
Ups! Nekaj je šlo narobe med oddajo obrazca.

Poglejte tudi ostale reference

HEE
Melavc
A modular battery storage system that grows with needs.
HEE
Panles
Battery storage system with LFP technology and intelligent GridIQ management.
BESS
Avtotehnika Celje
The storage system optimizes costs and energy usage at Avtotehnika Celje.
BESS
CNC Prijatelj
Our software optimizes operations and shortens process times.
BESS
Naturalica Foods
GeoEnergy and GridIQ storage system for tip cutting and energy optimization.
BESS
PV
Riko Ekos
Riko Ekos optimizes consumption with a new solar power plant and BESS.
BESS
ANIS TREND
Anis Trend reduces costs and optimizes consumption by cutting with GeoEnergy battery and GridIQ
BESS
Jekon
Photovoltaic profit maximization and price arbitrage with GridiQ system.
BESS
Setrans
Efficiency of investment through market management of energy from BESS.
BESS
Seltron
Cost optimization through smart market energy management.
BESS
PV
Royal Parketi
Energy independence through the merger of a solar power plant and BESS.
BESS
PV
ATRIUM - NOVI INTERIERI
Podjetje Atrium je z lastno sončno elektrarno in 215 kWh hranilnikom energije optimiziralo stroške
BESS
PV
BS VAR
Advanced management of solar power plant and electricity storage in real time
PV
Delakorda
Integration of solar power plants to increase energy independence
HEE
PV
Benko Tehna
Advanced management of solar power plant and energy storage in real time.
BESS
IMPULS Domžale
Napredno upravljanje sončne elektrarne in hranilnika električne energije.
PV
AJM OKNA-VRATA-SENČILA
Solar power plant to reduce electricity consumption from the grid
BESS
PV
Lestro Ledinek
Advanced management of solar power plant and electricity storage for energy independence
BESS
PV
Demago
Integration of solar power plant and BESS to increase energy independence
BESS
PV
Zlatorog Oprema
The company was looking for an optimal solution to reduce energy costs and increase self-sufficienc
BESS
PV
Metalna Termis
156.6 kWp solar power plant for lower grid power consumption
BESS
PV
Metalna Impro
The battery saver allows the company to engage in self-care by cutting the tips.
Contact

Tell us about your company

Do you have questions about our energy solutions? Want to learn more about how our technologies can help your business? Contact us and our team of experts will answer your questions and help you find the best solution for your needs.

Start filling out the form
Hvala! Vaša prijava je bila prejeta!
Ups! Nekaj je šlo narobe med oddajo obrazca.